This a 40 MW hydropower project that lies on the Bua River, in the central region of Malawi, in Nkhotakota district.
A pre – feasibility study has been completed with a full feasibility study yet to be conducted.
This a 40 MW hydropower project that lies on the Bua River, in the central region of Malawi, in Nkhotakota district.
A pre – feasibility study has been completed with a full feasibility study yet to be conducted.